عناصر مشابهة

Maintenance Management for Airport Airfield Using MicroPaver Computer Software: Case Study

تفصيل البيانات البيبلوغرافية
الناشر: عمان
المؤلف الرئيسي: Eneizat, Sahel Mohammad (مؤلف)
مؤلفين آخرين: Jrew, Basim (Advisor)
التاريخ الميلادي:2017
الصفحات:1 - 102
رقم MD:901381
نوع المحتوى: رسائل جامعية
اللغة:English
قواعد المعلومات:Dissertations
الدرجة العلمية:رسالة ماجستير
الجامعة:جامعة الاسراء الخاصة
الكلية:كلية الهندسة
مواضيع:
رابط المحتوى:
LEADER 03040nam a22003257a 4500
001 1487644
041 |a eng 
100 |9 482752  |a Eneizat, Sahel Mohammad  |e Author 
245 |a Maintenance Management for Airport Airfield Using MicroPaver Computer Software: Case Study 
260 |a عمان  |c 2017 
300 |a 1 - 102 
336 |a رسائل جامعية 
502 |b رسالة ماجستير  |c جامعة الاسراء الخاصة  |f كلية الهندسة  |g الاردن  |o 0042 
520 |a Maintenance management system and Airport Pavement Management System (APMS) developed and found by airport agencies and operator to keep the facilities in airfield running in full capacity. The expert system such as Pavement Management System (PMS) found and developed in the late of 1970s such as Micro Paver to help airport management in their decision regarding maintenance activity in the airfield. Research aims is to construct and establish Maintenance Management System (MMS) for airport with systematic procedure for maintaining and updating the pavement condition. Since the airfield pavement represent an important infrastructure in the airports. This infrastructure requires care through periodic evaluation and continuous maintenance to keep the airfield pavement operation under acceptable level of service. In this study, historical data of airfield pavement distress were collected. These data categorized and analyzed using Micro Paver and Paveair software's which are used to calculate current pavement condition and the future condition prediction. The study was conducted on airfield pavement of international airport. The selected airfield contains: two parallel runways, fourteen taxiway, and seven aprons which are includes commercial apron, cargo apron and maintenance apron. Visual condition survey were conducted and the analysis performed to determine the effective maintenance selection, budget determination, and budget prioritizing for current and future condition. The proposed APMS include four major components: Data collection, Data Analysis, Maintenance and Rehabilitation plan (M&R) and implementation. 
653 |a نظام إدارة رصف المطار  |a الصيانة والتأهيل  |a هندسة البرمجيات  |a هندسة المطارات 
700 |9 482487  |a Jrew, Basim  |e Advisor 
856 |u 9802-021-004-0042-T.pdf  |y صفحة العنوان 
856 |u 9802-021-004-0042-A.pdf  |y المستخلص 
856 |u 9802-021-004-0042-C.pdf  |y قائمة المحتويات 
856 |u 9802-021-004-0042-F.pdf  |y 24 صفحة الأولى 
856 |u 9802-021-004-0042-1.pdf  |y 1 الفصل 
856 |u 9802-021-004-0042-2.pdf  |y 2 الفصل 
856 |u 9802-021-004-0042-3.pdf  |y 3 الفصل 
856 |u 9802-021-004-0042-4.pdf  |y 4 الفصل 
856 |u 9802-021-004-0042-O.pdf  |y الخاتمة 
856 |u 9802-021-004-0042-R.pdf  |y المصادر والمراجع 
856 |u 9802-021-004-0042-S.pdf  |y الملاحق 
930 |d y 
995 |a Dissertations 
999 |c 901381  |d 901381