عناصر مشابهة

Critical Success Factors In Risk Allocation in Public-Private Partnership in Kuwait (ppp)

تفصيل البيانات البيبلوغرافية
الناشر: المنامة
المؤلف الرئيسي: Al-Hasan, Fuad (مؤلف)
مؤلفين آخرين: Said, Karim (Advisor)
التاريخ الميلادي:2016
التاريخ الهجري:1437
الصفحات:1 - 61
رقم MD:1013875
نوع المحتوى: رسائل جامعية
اللغة:English
قواعد المعلومات:Dissertations
الدرجة العلمية:رسالة ماجستير
الجامعة:جامعة الخليج العربي
الكلية:المعهد الفرنسي العربي لإدارة الأعمال
مواضيع:
رابط المحتوى:
LEADER 02748nam a2200325 4500
001 1753912
041 |a eng 
100 |9 548244  |a Al-Hasan, Fuad   |e Author 
245 |a Critical Success Factors In Risk Allocation in Public-Private Partnership in Kuwait (ppp) 
260 |a المنامة  |c 2016  |m 1437 
300 |a 1 - 61 
336 |a رسائل جامعية 
502 |b رسالة ماجستير  |c جامعة الخليج العربي  |f المعهد الفرنسي العربي لإدارة الأعمال  |g البحرين  |o 0011 
520 |a The purpose of the study is to investigate the subject of risk allocation as the critical factor for the success of Public Private Partnership (PPP) projects. Extensive literature review that analyses the various aspects of PPP projects and a questionnaire survey was carried upon the selected sample of respondents’ i.e. employees and managers of the top level companies interacting with PPP projects so that the aims and objectives of the study can be achieved. A questionnaire was sent to a sample of interactive employee with PPP projects. The questionnaire was based on likert scale and the response rate was 100% of all participants. The results were analyzed to assess the potential of PPP projects risk allocation system so that it can be successfully implemented as per the economy of Kuwait. This study was concentrated on the area of PPP projects in Kuwait and the conclusion for this study has been based on the survey done upon the selected respondents. Thus, the results can be applied upon the further success of the PPP projects. Apart from risk allocation, this study also concentrates on the key dimensions such as political interference, legal framework of PPP and the divergent of objectives. This study will also provide necessary recommendations for the areas that need extensive improvement for the achievement of the international benchmark. 
653 |a القطاع الخاص  |a القطاع العام  |a الكويت 
700 |a Said, Karim  |e Advisor  |9 546872 
856 |u 9812-007-005-0011-T.pdf  |y صفحة العنوان 
856 |u 9812-007-005-0011-A.pdf  |y المستخلص 
856 |u 9812-007-005-0011-C.pdf  |y قائمة المحتويات 
856 |u 9812-007-005-0011-F.pdf  |y 24 صفحة الأولى 
856 |u 9812-007-005-0011-1.pdf  |y 1 الفصل 
856 |u 9812-007-005-0011-2.pdf  |y 2 الفصل 
856 |u 9812-007-005-0011-3.pdf  |y 3 الفصل 
856 |u 9812-007-005-0011-4.pdf  |y 4 الفصل 
856 |u 9812-007-005-0011-O.pdf  |y الخاتمة 
856 |u 9812-007-005-0011-R.pdf  |y المصادر والمراجع 
856 |u 9812-007-005-0011-S.pdf  |y الملاحق 
930 |d y 
995 |a Dissertations 
999 |c 1013875  |d 1013875